SR 529 over DRAINAGE

100 EAST OF SOUTH STREET · County 003, Connecticut · Built 1959 · 4 Lanes · 15,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00478
Year Built
1959
Reconstructed
1985
Length
16.5 m (54.1 ft)
Max Span
14.6 m
Width
20.9 m (68.6 ft)
Lanes
4
Daily Traffic
15,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.