U.S. ROUTE 6 over COPPER MINE BROOK

0.6 MI EAST OF ROUTE 229 · County 003, Connecticut · Built 2002 · 4 Lanes · 19,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
00473
Year Built
2002
Length
15.9 m (52.2 ft)
Max Span
14 m
Width
49.4 m (162.1 ft)
Lanes
4
Daily Traffic
19,600
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.