WEST WASHINGTON ST over COPPER MINE BROOK

0.7 MI EAST OF ROUTE 229 · County 003, Connecticut · Built 2007 · 2 Lanes · 4,940 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
04103
Year Built
2007
Length
11.3 m (37.1 ft)
Max Span
11 m
Width
14.7 m (48.2 ft)
Lanes
2
Daily Traffic
4,940
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.