ROUTE 2 over NEW ENG CENTRAL RR

.7 MILE EAST OF I-395 · County 011, Connecticut · Built 1959 · 6 Lanes · 17,800 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00410
Year Built
1959
Reconstructed
2015
Length
18.9 m (62 ft)
Max Span
16.2 m
Width
41.4 m (135.8 ft)
Lanes
6
Daily Traffic
17,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.