ROUTE 2 over NEW LONDON TPKE

.6 MI E OF INTERSTATE-395 · County 011, Connecticut · Built 1959 · 4 Lanes · 16,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00409
Year Built
1959
Reconstructed
1990
Length
28.8 m (94.5 ft)
Max Span
27.4 m
Width
28.9 m (94.8 ft)
Lanes
4
Daily Traffic
16,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.