INTERSTATE-395 over ROUTE 82

1.2 MI N OF FITCH HILL RD · County 011, Connecticut · Built 1958 · 5 Lanes · 46,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00271
Year Built
1958
Reconstructed
1998
Length
50.4 m (165.4 ft)
Max Span
24.7 m
Width
34.6 m (113.5 ft)
Lanes
5
Daily Traffic
46,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.