MAPLEWOOD CEM BR over INTERSTATE-395

.3 MI SOUTH OF ROUTE 82 · County 011, Connecticut · Built 1958 · 2 Lanes · 12 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
00270
Year Built
1958
Length
49.7 m (163.1 ft)
Max Span
23.5 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
12
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.