I-95 TR 812 over I95 I91 SR724EB TR801

EXIT 47 OFF I-95 NB · County 009, Connecticut · Built 2011 · 1 Lanes · 5,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00169
Year Built
2011
Length
577.6 m (1895 ft)
Max Span
85 m
Width
8.9 m (29.2 ft)
Lanes
1
Daily Traffic
5,500
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.