INTERSTATE-91 SB over US ROUTE 1

0.1 MI N OF I-95 · County 009, Connecticut · Built 2014 · 2 Lanes · 33,100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
03034
Year Built
2014
Length
47.4 m (155.5 ft)
Max Span
45 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
33,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.