INTERSTATE-95 over STAGG STREET

0.5 MI N OF ROUTE 113 · County 001, Connecticut · Built 1959 · 6 Lanes · 101,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00124
Year Built
1959
Reconstructed
1995
Length
30.5 m (100.1 ft)
Max Span
29 m
Width
38.9 m (127.6 ft)
Lanes
6
Daily Traffic
101,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.