INTERSTATE-95 over RTE 113 (HOLLISTER AVE.)

0.7 MI N OF ROUTE 130 · County 001, Connecticut · Built 1959 · 6 Lanes · 93,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00122
Year Built
1959
Reconstructed
1988
Length
27.6 m (90.6 ft)
Max Span
26 m
Width
38.9 m (127.6 ft)
Lanes
6
Daily Traffic
93,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.