INTERSTATE-95 over FERRIS DRIVE

0.3 M EAST OF I-95 EXIT 5 · County 001, Connecticut · Built 1958 · 6 Lanes · 142,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00020
Year Built
1958
Length
18.1 m (59.4 ft)
Max Span
16.7 m
Width
39.6 m (129.9 ft)
Lanes
6
Daily Traffic
142,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.