INTERSTATE-95 over SOUND BEACH AVENUE

0.2 M EAST OF I95 EXIT 5 · County 001, Connecticut · Built 1958 · 7 Lanes · 135,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00019
Year Built
1958
Length
20.4 m (66.9 ft)
Max Span
18.3 m
Width
43.2 m (141.7 ft)
Lanes
7
Daily Traffic
135,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.