US 160 ML over CITY ST_ANIMAS RVR
S. EDGE OF DURANGO · County 067, Colorado · Built 1979 · 5 Lanes · 35,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
37.235733, -107.868867
This bridge is in worse condition than 79% of bridges in County 067. The average bridge in Colorado is 0 years old; this one is 47 years old.
Nearby Bridges
COUNTY ROAD 213 over ANIMAS RIVER
Built 2004
US 160 ML over LIGHTNER CREEK
Built 1971
US 160 ML over ANIMAS RIVER
Built 1974
US 550 NBND RMP over US160 ML WILSON GULCH
Built 2010
US 550 ML over GULCH B
Built 2023
US 160 RAMP over US 160 ML WILSON GULCH
Built 2010
US 550 ML over GULCH A
Built 2023
US 550 ML over WILSON GULCH/PED PATH
Built 2010
US 160 ML WB RMP over WILSON GULCH & Ped Path
Built 2010
PRIVATE LAND ACCES over LIGHTNER CREEK AR
Built 1973
Bridge Details
- Structure #
- P-05-S
- Year Built
- 1979
- Reconstructed
- 1983
- Length
- 153 m (502 ft)
- Max Span
- 59 m
- Width
- 26.2 m (86 ft)
- Lanes
- 5
- Daily Traffic
- 35,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.