US 550 ML over WILSON GULCH/PED PATH

US160/550 Interchange · County 067, Colorado · Built 2010 · 1 Lanes · 3,207 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
P-05-W
Year Built
2010
Length
92.8 m (304.5 ft)
Max Span
49.5 m
Width
8.8 m (28.9 ft)
Lanes
1
Daily Traffic
3,207
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.