I 25 ML NBND over I 25 BUSS RT

AGUILAR INT. · County 071, Colorado · Built 1959 · 2 Lanes · 6,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
O-18-BH
Year Built
1959
Length
28.5 m (93.5 ft)
Max Span
9.1 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
6,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.