I 25 ML NBND over RUGBY ARROYO

2.3 MI N OF AGUILAR INT. · County 071, Colorado · Built 1969 · 2 Lanes · 5,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
O-18-AG
Year Built
1969
Length
28.9 m (94.8 ft)
Max Span
9.1 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
5,500
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.