MALLEY DRIVE over FARMERS HIGHLINE CA
JUST E OF HIGHLINE DRIVE · County 001, Colorado · Built 1960 · 5 Lanes · 13,261 vehicles/day
Overall
Deck
9
Excellent
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
39.903467, -104.983256
This bridge is in worse condition than 79.4% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 66 years old.
Nearby Bridges
112TH PLACE over FARMERS HIGHLINE CA
Built 1960
COMMUNITY CENTR DR over I-25
Built 2004
I 25 ML over FARMERS HIGHLINE CANAL
Built 1954
ACOMA STREET over FARMERS HIGHLINE CA
Built 1960
I 25 SBND over WAGON RD RTD RAMP R
Built 1992
120TH AVENUE over FARMERS HIGHLINE CNL
Built 1975
SH 128 ML/120TH AV over I 25 ML
Built 2006
104TH AVE over I 25 ML
Built 2009
CLAUDE COURT over BRANTNER GULCH
Built 1986
128TH AVE over I25 ML
Built 2008
Bridge Details
- Structure #
- NGLN-MA-0.3-112
- Year Built
- 1960
- Length
- 7.3 m (24 ft)
- Max Span
- 6.2 m
- Width
- 24.4 m (80.1 ft)
- Lanes
- 5
- Daily Traffic
- 13,261
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.