128TH AVE over I25 ML
0.5 MI W OF WASHINGTON ST · County 001, Colorado · Built 2008 · 4 Lanes · 20,090 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.928464, -104.988342
This bridge is in worse condition than 22.8% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 18 years old.
Nearby Bridges
HURON STREET over BIG DRY CREEK
Built 2004
I 25 ML over BIG DRY CREEK
Built 1956
HURON STREET over BULL CANAL
Built 1978
HURON ST over QUAIL CREEK
Built 2006
136TH AVENUE over I-25 ML
Built 2004
SH 128 ML/120TH AV over I 25 ML
Built 2006
120TH AVENUE over FARMERS HIGHLINE CNL
Built 1975
136TH AVENUE over BIG DRY CREEK
Built 2004
128TH AVENUE over BIG DRY CREEK
Built 1978
I 25 SBND over WAGON RD RTD RAMP R
Built 1992
Bridge Details
- Structure #
- E-17-ADM
- Year Built
- 2008
- Length
- 82.4 m (270.3 ft)
- Max Span
- 39.9 m
- Width
- 23.2 m (76.1 ft)
- Lanes
- 4
- Daily Traffic
- 20,090
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.