I 25 ML NBND over MISSOURI CREEK

4.2 MI N OF SH10-WLSNBRG. · County 055, Colorado · Built 2011 · 2 Lanes · 6,500 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
N-17-BU
Year Built
2011
Length
36.1 m (118.4 ft)
Max Span
5.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
6,500
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$574,000
Total Project Cost
$861,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.