I 25 NBND over SULL CREEK

1.7 MILES NORTH OF SH10/W · County 055, Colorado · Built 1963 · 2 Lanes · 4,650 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
N-17-BG
Year Built
1963
Length
56.4 m (185 ft)
Max Span
21 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
4,650
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$227,000
Total Project Cost
$340,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.