COUNTY ROAD I.9 over GOVNMENT HIGHLINE CANAL

AT CAMEO · County 077, Colorado · Built 2017 · 2 Lanes · 309 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
MESA-I.9-39.2A
Year Built
2017
Length
27.5 m (90.2 ft)
Max Span
25.9 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
309
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.