COUNTY ROAD I.9 over LOCAL DRAINAGE
AT CAMEO SHOOTING & EDU. · County 077, Colorado · Built 2022 · 2 Lanes · 296 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
39.151792, -108.322594
This bridge is in worse condition than 23.4% of bridges in County 077. The average bridge in Colorado is 0 years old; this one is 4 years old.
Nearby Bridges
COUNTY ROAD I.9 over GOVNMENT HIGHLINE CANAL
Built 2017
I.9 ROAD over Local Drainage
Built 1901
COUNTY ROAD I.9 over COLORADO RIVER
Built 1994
I 70 ML WBND over I 70 FRONTAGE ROAD
Built 1963
I 70 ML EBND over I 70 FRONTAGE ROAD
Built 1963
PARK ACCESS ROAD over I 70 ML AR
Built 1965
I 70 ML over RAPID CREEK
Built 1963
I 70 ML WBND over COLORADO RIVER
Built 1985
I 70 ML over US 6 ML UPRR COLO RIVER
Built 1962
I 70 ML EBND over COLORADO RIVER
Built 1985
Bridge Details
- Structure #
- MESA-I.9-38.9
- Year Built
- 2022
- Length
- 11.1 m (36.4 ft)
- Max Span
- 4.9 m
- Width
- 21.3 m (69.9 ft)
- Lanes
- 2
- Daily Traffic
- 296
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.