US 350 ML over LONE TREE ARROYO
9.1 MI NE OF BLOOM · County 089, Colorado · Built 2024 · 2 Lanes · 510 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
37.771, -103.826994
This bridge is in worse condition than 10.7% of bridges in County 089. The average bridge in Colorado is 0 years old; this one is 2 years old.
Nearby Bridges
US 350 ML over HOE RANCH ARROYO
Built 2024
US 350 ML over DRAW
Built 1937
US 350 ML over SHEEP CANYON ARROYO
Built 2024
US 350 ML over TIMPAS CREEK TRIBUTARY A
Built 2012
COUNTY ROAD N over SOUTH DRY CREEK
Built 1965
COUNTY ROAD N over TIMPAS CREEK
Built 1935
US 350 ML over DRAW
Built 1936
US 350 ML over SEASONAL WASH
Built 2023
US 350 ML over DRAW
Built 2023
US 350 ML over IRON SPRINGS ARROYO
Built 1936
Bridge Details
- Structure #
- M-21-K
- Year Built
- 2024
- Length
- 15.8 m (51.8 ft)
- Max Span
- 5.1 m
- Width
- 18.9 m (62 ft)
- Lanes
- 2
- Daily Traffic
- 510
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.