US 350 ML over DRAW
1 MI NE OF TIMPAS · County 089, Colorado · Built 2023 · 2 Lanes · 440 vehicles/day
Overall
Culvert
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 9 | Excellent |
Location
37.829, -103.760994
This bridge is in worse condition than 9.2% of bridges in County 089. The average bridge in Colorado is 0 years old; this one is 3 years old.
Nearby Bridges
US 350 ML over SEASONAL WASH
Built 2023
COUNTY ROAD N over TIMPAS CREEK
Built 1935
US 350 ML over TIMPAS CREEK TRIBUTARY A
Built 2012
US 350 ML over DRAW
Built 1937
COUNTY ROAD N over SOUTH DRY CREEK
Built 1965
COUNTY ROAD 21 over CROOKED ARROYO
Built 1999
COUNTY ROAD N over CROOKED ARROYO TRIBUTARY
Built 2001
US 350 ML over CROOKED ARROYO
Built 1935
US 350 ML over LONE TREE ARROYO
Built 2024
COUNTY ROAD 17 over DRY CREEK
Built 1989
Bridge Details
- Structure #
- M-21-JA
- Year Built
- 2023
- Length
- 11.2 m (36.7 ft)
- Max Span
- 5.1 m
- Width
- 19.2 m (63 ft)
- Lanes
- 2
- Daily Traffic
- 440
- Material
- Aluminum, Wrought Iron, or Cast Iron
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.