MINERAL AVE over LEE GULCH

0.3 MI S OF DRY CREEK · County 005, Colorado · Built 2021 · 4 Lanes · 19,170 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
LTNF.150-04.150
Year Built
2021
Length
7.2 m (23.6 ft)
Max Span
2.1 m
Width
48.9 m (160.4 ft)
Lanes
4
Daily Traffic
19,170
Material
Steel
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.