COUNTY LINE RD over HIGHLINE CANAL
0.5 MI W OF BROADWAY · County 035, Colorado · Built 1965 · 2 Lanes · 10,720 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
39.564742, -104.999006
This bridge is in worse condition than 87.5% of bridges in County 035. The average bridge in Colorado is 0 years old; this one is 61 years old.
Nearby Bridges
KENDRICK CASTILLO over C470 ML
Built 1997
SH 470 ML WBND over BROADWAY
Built 1985
SH 470 ML EBND over BROADWAY
Built 1984
BROADWAY over UNNAMED DRAW
Built 1985
MINERAL AVE over HIGHLINE CANAL
Built 1981
GALLUP ST over HIGHLINE CANAL
Built 1962
SH 470 ML over HIGHLINE CANAL
Built 1984
MINERAL AVE over LEE GULCH
Built 2021
WINDERMERE ST over HIGHLINE CANAL
Built 1964
FREMONT AVE over HIGHLINE CANAL
Built 1965
Bridge Details
- Structure #
- LTNF.120-03.949
- Year Built
- 1965
- Length
- 21.2 m (69.6 ft)
- Max Span
- 8.9 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 10,720
- Material
- Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $339,000
- Total Project Cost
- $373,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.