County Road 11H over Big Thompson River
0.3 Mi N of St Hwy 402 · County 069, Colorado · Built 1966 · 2 Lanes · 8,892 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
40.383178, -105.054294
This bridge is in worse condition than 85.9% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 60 years old.
Nearby Bridges
County Road 13C over Big Thompson River
Built 1983
US 287 ML over BIG THOMPSON RIVER
Built 1950
Monroe Avenue over Greeley Loveland Canal
Built 1922
East 4th Street over Greeley Loveland Canal
Built 1921
7th Street(CR 20D) over Greeley Loveland Canal
Built 1986
Washington Avenue over Greeley Loveland Canal
Built 1922
US 287 NBND over GREELEY-LOVELAND CANAL
Built 2002
North Madison Ave over Greeley Loveland Canal
Built 2015
US287 SBND over GREELEY-LOVELAND CANAL
Built 2003
County Road 9E over Big Thompson River
Built 1988
Bridge Details
- Structure #
- LR11H-0.3-S402
- Year Built
- 1966
- Length
- 22.2 m (72.8 ft)
- Max Span
- 21.1 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 8,892
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $401,000
- Total Project Cost
- $441,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.