US287 SBND over GREELEY-LOVELAND CANAL

CLEVELAND AVE at 1st ST · County 069, Colorado · Built 2003 · 4 Lanes · 5,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
C-16-BH
Year Built
2003
Length
13.6 m (44.6 ft)
Max Span
12.6 m
Width
22.3 m (73.2 ft)
Lanes
4
Daily Traffic
5,500
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.