HAVANA STREET over HAPPY CANYON CREEK | PED
1.3 MI S OF RIDGEGATE · County 035, Colorado · Built 2009 · 2 Lanes · 1,145 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
39.509853, -104.870508
This bridge is in worse condition than 28.4% of bridges in County 035. The average bridge in Colorado is 0 years old; this one is 17 years old.
Nearby Bridges
I 25 ML over HAPPY CANYON CREEK
Built 1999
I 25 ML over RIDGEGATE PKWY
Built 2008
EB RIDGEGATE PARKW over HAPPY CANYON CREEK
Built 2010
WB RIDGEGATE PARKW over HAPPY CANYON CREEK
Built 2019
I 25 ML over CLYDESDALE LN
Built 1999
SKY RIDGE AVENUE over NB I25 ML | SB I25 ML
Built 2018
HESS ROAD over LIVESTOCK CROSSING
Built 2012
LINCOLN AVE over I 25 ML
Built 1990
EB RIDGEGATE PARKW over BADGER GULCH
Built 2019
MERIDIAN BOULEVARD over COTTONWOOD CREEK | PED P
Built 1991
Bridge Details
- Structure #
- LONE TREE-3
- Year Built
- 2009
- Length
- 36.6 m (120.1 ft)
- Max Span
- 35.1 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 1,145
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.