I 25 ML over RIDGEGATE PKWY
I25 AT RIDGEGATE PKWY · County 035, Colorado · Built 2008 · 9 Lanes · 116,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.522897, -104.867094
This bridge is in worse condition than 64.8% of bridges in County 035. The average bridge in Colorado is 0 years old; this one is 18 years old.
Nearby Bridges
SKY RIDGE AVENUE over NB I25 ML | SB I25 ML
Built 2018
EB RIDGEGATE PARKW over HAPPY CANYON CREEK
Built 2010
WB RIDGEGATE PARKW over HAPPY CANYON CREEK
Built 2019
HAVANA STREET over HAPPY CANYON CREEK | PED
Built 2009
I 25 ML over HAPPY CANYON CREEK
Built 1999
LINCOLN AVE over I 25 ML
Built 1990
MERIDIAN BOULEVARD over COTTONWOOD CREEK | PED P
Built 1991
MERIDIAN BOULEVARD over COTTONWOOD CREEK | PED P
Built 1991
EB RIDGEGATE PARKW over BADGER GULCH
Built 2019
WB RIDGEGATE PARKW over BADGER GULCH
Built 2010
Bridge Details
- Structure #
- F-17-PT
- Year Built
- 2008
- Length
- 42.1 m (138.1 ft)
- Max Span
- 40.9 m
- Width
- 48.2 m (158.1 ft)
- Lanes
- 9
- Daily Traffic
- 116,000
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.