US 50 ML over PURCELL BLVD

2.3 MI W of SH45 · County 101, Colorado · Built 2022 · 4 Lanes · 36,000 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
K-18-NA
Year Built
2022
Length
69.2 m (227 ft)
Max Span
35.7 m
Width
38.1 m (125 ft)
Lanes
4
Daily Traffic
36,000
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.