US 50 ML over DRY CREEK

0.6 MI E OF JCT SH 45 · County 101, Colorado · Built 2018 · 3 Lanes · 43,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
K-18-DA
Year Built
2018
Length
57 m (187 ft)
Max Span
21.5 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
43,000
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,089,000
Total Project Cost
$3,133,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.