US 85 ML over FOUNTAIN CREEK

0.5 MI N OF JCT I-25 ML · County 041, Colorado · Built 1930 · 2 Lanes · 11,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
J-18-M
Year Built
1930
Reconstructed
1964
Length
173 m (567.6 ft)
Max Span
24.4 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
11,000
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.