I 25 ML NBND over DRAW

0.5 MI NW OF JCT US 85 · County 041, Colorado · Built 1956 · 2 Lanes · 23,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
J-18-AK
Year Built
1956
Reconstructed
1987
Length
41.2 m (135.2 ft)
Max Span
15.3 m
Width
17.3 m (56.8 ft)
Lanes
2
Daily Traffic
23,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.