SH 94 ML over BLACK SQUIRREL CREEK
1.4 MI E OF ELLICOTT · County 041, Colorado · Built 1966 · 2 Lanes · 2,800 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.838542, -104.361228
This bridge is in worse condition than 60.7% of bridges in County 041. The average bridge in Colorado is 0 years old; this one is 60 years old.
Nearby Bridges
SH 94 ML over BIG SPRING CREEK
Built 1968
HANDLE ROAD over SPRING CREEK
Built 1991
HANDLE ROAD over SQUIRREL CREEK
Built 1991
SH 94 ML over DRAW
Built 1982
ELLICOTT HIGHWAY over BLACK SQUIRREL CK TRIB.
Built 1996
ELLICOTT HWY over SQUIRREL CREEK
Built 2023
LOG ROAD over SQUIRREL CREEK
Built 1997
CALHAN ROAD over SPRING CREEK
Built 1992
LOG ROAD over SQUIRREL CREEK
Built 1997
BIG SPRINGS RD over BIG SPRING CREEK
Built 1992
Bridge Details
- Structure #
- I-19-AJ
- Year Built
- 1966
- Length
- 46.3 m (151.9 ft)
- Max Span
- 18.3 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,800
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.