ELLICOTT HWY over SQUIRREL CREEK

1.75 MI N OF ELLICOTT · County 041, Colorado · Built 2023 · 2 Lanes · 1,798 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
EPC0493-11.77A
Year Built
2023
Length
70 m (229.7 ft)
Max Span
25 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
1,798
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.