I25 SB OFF RAMP over FOUNTAIN CREEK
_ · County 041, Colorado · Built 2015 · 2 Lanes · 58,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 9 | Excellent |
Location
38.828525, -104.835914
This bridge is in worse condition than 38.5% of bridges in County 041. The average bridge in Colorado is 0 years old; this one is 11 years old.
Nearby Bridges
25TH STREET over FOUNTAIN CREEK
Built 1915
RAMP TO I 25 NBND over FOUNTAIN CREEK
Built 2017
I 25 ML over US 24 ML FOUNTAIN CRK
Built 2017
CIMARRON STREET over FOUNTAIN CREEK
Built 2017
US 24 ML over FOUNTAIN CREEK
Built 2015
8TH STREET over FOUNTAIN CREEK
Built 1951
CIMARRON STREET over UP RR/CONEJOS ST
Built 2009
I 25 ML SBND over COLORADO AVE SPRUCE ST
Built 2008
I 25 ML NBND over COLORADO AVE SPRUCE ST
Built 2008
COLORADO AVENUE over MONUMENT CREEK
Built 1998
Bridge Details
- Structure #
- I-17-QE
- Year Built
- 2015
- Length
- 40 m (131.2 ft)
- Max Span
- 14.6 m
- Width
- 15.6 m (51.2 ft)
- Lanes
- 2
- Daily Traffic
- 58,000
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.