25TH STREET over FOUNTAIN CREEK
0.2 MI S OF COLORADO AVE · County 041, Colorado · Built 1915 · 2 Lanes · 283 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
38.828481, -104.834986
This bridge is in worse condition than 98% of bridges in County 041. The average bridge in Colorado is 0 years old; this one is 111 years old.
Nearby Bridges
RAMP TO I 25 NBND over FOUNTAIN CREEK
Built 2017
I25 SB OFF RAMP over FOUNTAIN CREEK
Built 2015
CIMARRON STREET over FOUNTAIN CREEK
Built 2017
I 25 ML over US 24 ML FOUNTAIN CRK
Built 2017
US 24 ML over FOUNTAIN CREEK
Built 2015
CIMARRON STREET over UP RR/CONEJOS ST
Built 2009
I 25 ML SBND over COLORADO AVE SPRUCE ST
Built 2008
I 25 ML NBND over COLORADO AVE SPRUCE ST
Built 2008
8TH STREET over FOUNTAIN CREEK
Built 1951
COLORADO AVENUE over MONUMENT CREEK
Built 1998
Bridge Details
- Structure #
- CSG-E.15-09.46
- Year Built
- 1915
- Length
- 20.1 m (65.9 ft)
- Max Span
- 9 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 283
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $290,000
- Total Project Cost
- $320,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.