US 24 ML WBND over SAND CREEK
EAST OF MURRAY BLVD · County 041, Colorado · Built 1975 · 2 Lanes · 15,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
38.810778, -104.745906
This bridge is in worse condition than 60.7% of bridges in County 041. The average bridge in Colorado is 0 years old; this one is 51 years old.
Nearby Bridges
US 24 ML over SAND CREEK
Built 1995
US 24 BYPASS over EAST FORK SAND CREEK
Built 1994
US 24 ML EBND over SAND CREEK
Built 1975
CHELTON ROAD over SAND CREEK
Built 1982
ACADEMY BLVD over SAND CREEK
Built 1977
AIRPORT ROAD over SAND CREEK
Built 1975
AIRPORT ROAD over SPRING CREEK
Built 2022
AIRPORT ROAD over WEST FORK SAND CREEK
Built 1979
MONICA DRIVE over MAIN STREAM
Built 1982
CHELTON ROAD over SPRING CREEK
Built 1972
Bridge Details
- Structure #
- I-17-HQ
- Year Built
- 1975
- Length
- 63.9 m (209.6 ft)
- Max Span
- 31.5 m
- Width
- 18.1 m (59.4 ft)
- Lanes
- 2
- Daily Traffic
- 15,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.