ACADEMY BLVD over SAND CREEK
0.2 MI N OF ASTROZON · County 041, Colorado · Built 1977 · 7 Lanes · 41,812 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
38.799472, -104.7574
This bridge is in worse condition than 82.6% of bridges in County 041. The average bridge in Colorado is 0 years old; this one is 49 years old.
Nearby Bridges
CHELTON ROAD over SAND CREEK
Built 1982
HANCOCK EXPWY over E. FORK SAND CREEK
Built 1978
US 24 ML EBND over SAND CREEK
Built 1975
US 24 ML over SAND CREEK
Built 1995
SPRINGNITE DRIVE over MAIN STREAM
Built 1982
US 24 BYPASS over EAST FORK SAND CREEK
Built 1994
US 24 ML WBND over SAND CREEK
Built 1975
MONICA DRIVE over MAIN STREAM
Built 1982
COLONY HILLS CIR over MAIN STREAM
Built 1982
ACADEMY BLVD over MAIN STREAM
Built 1973
Bridge Details
- Structure #
- CSG-K.08-06.33
- Year Built
- 1977
- Reconstructed
- 1978
- Length
- 101.3 m (332.3 ft)
- Max Span
- 18.5 m
- Width
- 31.2 m (102.4 ft)
- Lanes
- 7
- Daily Traffic
- 41,812
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.