I 25 ML over ACADEMY BLVD

AT INT. OF ACADEMY & I25 · County 041, Colorado · Built 2024 · 4 Lanes · 13,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
I-17-GS
Year Built
2024
Length
86.7 m (284.4 ft)
Max Span
42.9 m
Width
38.1 m (125 ft)
Lanes
4
Daily Traffic
13,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.