WBND ACADEMY BLVD over RAMP D TO WBND ACADEMY

0.8 MI W OF I-25 · County 041, Colorado · Built 2012 · 3 Lanes · 22,809 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
EPC4099-01.13L
Year Built
2012
Length
38.2 m (125.3 ft)
Max Span
36.7 m
Width
16.8 m (55.1 ft)
Lanes
3
Daily Traffic
22,809
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.