COUNTY ROAD 120 over SANDY ARROYO
3.8 MI N OF SH 10 · County 055, Colorado · Built 1995 · 2 Lanes · 65 vehicles/day
Overall
Deck
9
Excellent
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.702825, -104.677692
This bridge is in worse condition than 20.2% of bridges in County 055. The average bridge in Colorado is 0 years old; this one is 31 years old.
Nearby Bridges
SH 10 ML over DRAW
Built 1984
SH 10 ML over CUCHARAS RIVER
Built 1984
COUNTY ROAD 230 over CUCHARAS RIVER
Built 1995
I 25 ML SBND over SULL CREEK
Built 1963
I 25 NBND over SULL CREEK
Built 1963
I 25 ML NBND over US 160 SH 10 RR SPUR
Built 1963
I 25 ML SBND over US 160 SH 10 RR SPUR
Built 2024
I 25 BUS RT over I 25 ML
Built 1963
I 25 ML NBND over CUCHARAS RIVER
Built 1963
I 25 ML SBND over CUCHARAS RIVER
Built 1963
Bridge Details
- Structure #
- HU120-2.7-S10A
- Year Built
- 1995
- Length
- 25.9 m (85 ft)
- Max Span
- 24.4 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 65
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.