I 25 ML over EAST PLUM CREEK
1.3 MI N OF LARKSPUR · County 035, Colorado · Built 2021 · 7 Lanes · 75,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.247781, -104.882872
This bridge is in worse condition than 28.4% of bridges in County 035. The average bridge in Colorado is 0 years old; this one is 5 years old.
Nearby Bridges
I 25 NBND RAMP over I 25 ML
Built 2021
I 25 ML over UP RR
Built 1980
CR56 | UPPER LAKE over EAST PLUM CREEK
Built 1996
I 25 ML over UPPER LAKE GULCH RD
Built 2021
FRONTAGE ROAD | MA over EAST PLUM CREEK
Built 1960
I 25 SB ML over WILDLIFE CROSSING
Built 2021
I 25 NB ML over WILDLIFE UNDERPASS
Built 2021
TOMAH ROAD over I 25 ML
Built 1965
SPRUCE MOUNTAIN RO over EAST PLUM CREEK
Built 2008
FARAWAY PLACE over EAST PLUM CREEK
Built 2016
Bridge Details
- Structure #
- H-17-CX
- Year Built
- 2021
- Length
- 98.6 m (323.5 ft)
- Max Span
- 38.3 m
- Width
- 44.8 m (147 ft)
- Lanes
- 7
- Daily Traffic
- 75,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.