FARAWAY PLACE over EAST PLUM CREEK
ENT COLUMBINE OPEN SPACE · County 035, Colorado · Built 2016 · 2 Lanes · 65 vehicles/day
Overall
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
39.282831, -104.895208
This bridge is in worse condition than 20.8% of bridges in County 035. The average bridge in Colorado is 0 years old; this one is 10 years old.
Nearby Bridges
TOMAH ROAD over I 25 ML
Built 1965
FRONTAGE ROAD | MA over EAST PLUM CREEK
Built 1960
I 25 NBND RAMP over I 25 ML
Built 2021
I 25 ML over EAST PLUM CREEK
Built 2021
I 25 ML over UP RR
Built 1980
I 25 ML over UPPER LAKE GULCH RD
Built 2021
CR56 | UPPER LAKE over EAST PLUM CREEK
Built 1996
COUNTY ROAD 58A over WEST PLUM CREEK TRIBUTAR
Built 1998
I 25 SB ML over WILDLIFE CROSSING
Built 2021
I 25 NB ML over WILDLIFE UNDERPASS
Built 2021
Bridge Details
- Structure #
- DOU057-00.20A
- Year Built
- 2016
- Length
- 42.8 m (140.4 ft)
- Max Span
- 14 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 65
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.