SH 340 ML EBND over COLORADO RIVER

0.8 MI W OF JCT I 70 BUS · County 077, Colorado · Built 1950 · 2 Lanes · 9,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
H-02-S
Year Built
1950
Length
262.5 m (861.2 ft)
Max Span
31.7 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
9,500
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.