SH 340 ML WBND over REDLANDS POWER CANAL

W. EDGE OF GRAND JUNCTION · County 077, Colorado · Built 1974 · 2 Lanes · 6,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
H-02-GB
Year Built
1974
Length
21.6 m (70.9 ft)
Max Span
20.7 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
6,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.