HOLLY STREET over GREENWOOD GULCH

.1 MI N OF ORCHARD RD · County 005, Colorado · Built 1991 · 2 Lanes · 6,528 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
GWDV-08-0.15-01
Year Built
1991
Length
16.5 m (54.1 ft)
Max Span
15.2 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
6,528
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$253,000
Total Project Cost
$278,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.