ORCHARD ROAD over GREENWOOD GULCH
0.70 MI W OF QUEBEC ST · County 005, Colorado · Built 1983 · 2 Lanes · 4,057 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.609561, -104.91655
This bridge is in worse condition than 49% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 43 years old.
Nearby Bridges
HOLLY STREET over GREENWOOD GULCH
Built 1991
HOLLY STREET over PRENTICE GULCH
Built 1992
FOREST WAY over Willow Creek
Built 1983
ARAPAHOE ROAD over Willow Creek
Built 1988
COLORADO BLVD over LITTLE DRY CREEK
Built 1970
I 25 ML over ORCHARD ROAD
Built 1958
I 25 ML over SH 88 ML W./BELLEVIEW
Built 1958
ORCHARD RD over HIGHLINE CANAL
Built 1990
BROOK VALLEY WAY over LITTLE DRY CREEK
Built 2000
E UNION AVENUE WB over RTD TRACKS | BELLEVIEW A
Built 1992
Bridge Details
- Structure #
- GWDV-07-0.32-01
- Year Built
- 1983
- Length
- 15.4 m (50.5 ft)
- Max Span
- 12.8 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 4,057
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $239,000
- Total Project Cost
- $260,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.